Worked solution from the Operations management Theory (Paper 2) booklet, Part 1 of 4.
Explain two reasons. Each reason has a point, an application to FO and an explanation.
Reason 1: to get the maximum output from the least inputs. (knowledge) [1]
FO makes wooden outdoor furniture such as tables and chairs, and using wood, nails, brackets and paint well keeps down waste, (application) [1]
which keeps unit costs low (analysis) [1]
and increases profit. (analysis) [1]
Reason 2: so FO does not run out of raw materials and deliveries are made on time. (knowledge) [1]
FO's orders to suppliers must be carefully planned to avoid late deliveries of components such as nails, brackets and paint. (application) [1]
If materials run out, there is a shortage of finished furniture, (analysis) [1]
which leads to unhappy customers and a poorer reputation. (analysis) [1]
Discuss the benefits and limitations of all three methods for contacting suppliers about a late delivery, then recommend one.
Email: benefit: it is sent quickly to suppliers of wood, can be sent to many people at once, and gives a hard copy that can be saved for later. Limitation: there is no guarantee it has been read (it could be in a junk folder or lost among many emails), it may not be secure and it needs an internet connection.
Mobile (cell) phone: benefit: FO knows the message has been received, can ask questions about the late order and get feedback straight away, and the supplier is more likely to have a mobile phone with them. Limitation: it may take time to reach the right person, it can be expensive, it is time consuming if many suppliers must be contacted and there is no hard copy.
Letter: benefit: it is a hard copy, it is more formal and a lot of detail can be included about the late delivery of nails and paint. Limitation: it is slower and can be more expensive than the other two, and there is no guarantee the supplier has received it.
Recommendation: email is the most suitable. The delivery is late and FO may need to know when the order will arrive, or its manufacturing of furniture may be delayed. A letter would be too slow.
Why the others are rejected: a mobile phone call may not reach the correct person straight away if they are busy, so FO would waste time ringing again. A letter would be too slow unless express delivery were arranged. (A phone call would be the better choice only if FO needs instant feedback about the wood order.)
This reaches Level 3 because it discusses all three methods in detail, applied to FO and its suppliers, and gives a well-justified recommendation that explains why the other two were rejected. [12]
▶ Topic lesson
A lesson on this topic · by Mr Lee - Business Econ. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.