Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods

Q336 · 9706/13/O/N/25 Q25

Worked solution from the Cost and management accounting (AS Level) MCQ booklet.

Q3369706/13/O/N/25original Q25Multiple choice
Question 25 from 9706/13/O/N/25

Worked solution

The question asks by how much overheads are under- or over-absorbed.

Absorption rate = budgeted overheads ÷ budgeted hours = $80 000 ÷ 10 000 = $8 per labour hour

Overheads absorbed = actual hours × rate = 11 000 × $8 = $88 000

Actual overheads = $82 000

Absorbed $88 000 is more than incurred $82 000, so overheads are over-absorbed by $88 000 − $82 000 = $6 000

So the answer is A.

B has the right amount but the wrong direction. C and D ($8 000) compare the absorbed $88 000 with the budgeted $80 000 instead of the actual $82 000.

KEY IDEAOver- or under-absorption = overheads absorbed (actual hours × rate) minus overheads incurred.
ANSWER A
VIDEO
▶ Starts at Q25 (51:04)

Starts at Q25 (51:04) · by Study with Prashna. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.