9609/32/F/M/20 question 2: worked solution (February/March 2020, paper 32)
Show as plain textHide plain text
Cambridge A2 Level Business 9609 · 9.3 Operations strategy Worked solution from the Operations management Theory (Paper 3) booklet, Part 3 of 3. Q17 9609/32/F/M/20 original Q2 Structured · 17 marks Worked solution (a) Capacity utilisation (%) = current (forecast) output ÷ capacity × 100 [1] = 425 ÷ 450 × 100 = 94.4% [1] (b) Unit cost = allocated fixed cost per tower + variable cost per tower (+ transport if outsourced) Factory expansion: $0.02m + $0.33m = $0.35m per tower [1] Outsourcing: $0.37m + $0.01m transport = $0.38m per tower [1] Difference = $0.38m − $0.35m = $0.03m (outsourcing is dearer; $30 000) [1] (c) Knowledge. Outsourcing is when a business contracts out an activity to a third party. The key factors in the decision are the reliability of the outsourcing company, the effect on quality , relative cost and the time each option takes. Application. FE's capacity utilisation is already 94.4% , so it is hard to raise production without more capacity. Outsourcing the towers to CT would release factory resources and add 150 turbines (600 in all), and CT could deliver within 4 months . Expansion adds 225 turbines (675 in all) but takes 12 months and needs $150m more non-current liabilities. Outsourcing costs $0.38m per tower, $0.03m more than making it in the factory. FE has always stressed quality and control of its own manufacturing. Analysis. Sales are growing by about 7% a year and FE worries it cannot meet 2021 orders. Expansion takes 12 months, so FE may miss this growth and lose sales. Outsourcing is faster and more flexible: if demand stops rising, FE can change the contract and keep a competitive cost per unit. Expansion is financed by borrowing, which raises gearing just as interest rates are forecast to rise from 4% to 6%, so costs go up. Against this, outsourcing costs more per tower, so FE must raise its price or accept a lower profit margin. Any fall in quality from CT could damage FE's reputation and its ability to charge a price premium. Evaluation. I would recommend outsourcing for now , because it meets the 2021 orders sooner, needs no extra borrowing and can be changed if demand falls. The recommendation depends on whether the costings are accurate, how long a contract with CT takes to agree, and whether CT can protect FE's quality standards. It also depends on time: in the long run, once the sales to fill an extended factory have grown, in-house production could be cheaper. In the short run the extended factory would run below capacity, so its extra fixed costs would be spread over few towers and raise the unit cost above outsourcing. The extension could also disrupt production for existing customers, and it raises fixed costs a lot, which hurts if demand does not rise. This earns the top level for knowledge: it defines outsourcing and gives several factors in the decision. [2] It earns the top level for application: points are applied to FE using the results (94.4%, $0.38m against $0.35m) and case facts (4 months against 12 months, $150m borrowing). [2] It reaches the top level for analysis: good use of theory shows how each option affects sales, quality, gearing, costs and profit. [4] It reaches the top level for evaluation: a supported recommendation with judgement on accuracy, time and the long run against the short run. [4] KEY IDEA A business short of capacity can outsource for a faster, more flexible and less risky fix, but it pays a higher unit cost and gives up some control of quality. TOTAL 17 marks Official mark scheme VIDEO ▶ Topic lesson A lesson on this topic · by Saifullah Ajaz . Tap the picture to open it on YouTube.