2059/21/M/J/25 question 3: worked solution (May/June 2025, paper 21)

Show as plain text

Cambridge O Level Pakistan Studies 2059 · 19.2 Non-renewables Worked solution from the Power Theory (Paper 2) booklet, Part 2 of 3. Q5 2059/21/M/J/25 original Q3 Structured · 25 marks Worked solution (a)(i) The city near a power station in the west is Quetta [1] The number of thermal power stations in Sindh is 6 [1] (a)(ii) Write any three points about the thermal power stations on Fig. 3.1: They are clustered and unevenly spread, mostly in the east, south-east and south [1] Most are in Sindh (and Punjab), more than in Balochistan or KPK; many are near Karachi [1] They are close to rivers , especially the Indus [1] Only one is in the west, to the south of Quetta (extra point; any three earn the marks). (b)(i) Place the words on the dotted lines: the large tower on the left is the cooling tower ; the unit where the fire is shown is the boiler ; the fan-like unit is the turbine ; the unit next to it, joined to the power lines, is the generator . Three or four correct earn 2 marks; one or two correct earn 1 mark. [2] (b)(ii) Write any two steps of open cast mining: Drills make holes in the rock and the surface rocks are removed, using explosives/blasting [1] Excavators/power shovels dig out the coal, which is loaded onto trucks or railway wagons and moved away [1] (b)(iii) Write any three other factors: Rugged terrain/mountains [1] Floods, storms or earthquakes damaging the network [1] The supply of fuels such as coal, oil, gas or water [1] (Also credited: pylons and grid, population demand, load shedding, loss in long transmission lines.) (b)(iv) Reason 1: natural resources are running out/limited in Pakistan [1] Development: so they have to be imported , which adds transport costs. [1] Reason 2: the costs of extraction are higher [1] Development: technology, machinery and skilled labour are needed. [1] (Also credited: imported minerals costing more when exchange rates change, rising demand, new taxes or tariffs.) (c)(i) Renewable energy is energy that can be reused and will not run out . [1] (c)(ii) Write two steps: Drill down to areas of underground heat; water is pumped down and heated by hot rocks, turning to steam [1] The steam comes to the surface and turns turbines , and the generator makes electricity [1] (d) View A (small-scale solar): it can supply households with no access to the national grid (around 25%) and remote areas, improving quality of life and access to education. It can generate during load shedding, and is relatively cheap, with NGOs sometimes paying for it. Against A: it would not produce enough energy for future home and industrial demand, equipment may still be too costly, some methods are not available 24/7, and storage batteries are extremely expensive. View B (large-scale hydel dams): they generate large amounts of energy, which reduces reliance on imported fossil fuels and improves the balance of trade. They give a steadier supply for industry, could reduce load shedding, and create jobs. Against B: dams flood a lot of land for the reservoir, may need expensive international experts, and have very high overall costs, which can cut spending on other services. Judgement: I agree more with view B, because only large projects can meet national demand, but small-scale solar is a good extra for villages beyond the grid. This reaches Level 3: it gives developed points on both views with evaluation and a supported judgement. [6] KEY IDEA Large projects meet national demand, while small-scale solar helps villages that are off the grid. TOTAL 25 marks Official mark scheme VIDEO ▶ Topic lesson A lesson on this topic · by Muhammad Yousuf Memon. Tap the picture to open it on YouTube.