Worked solution from the Data Types and Structures Paper 2 Problem-solving and Programming booklet, Part 2 of 4.
Write any two of these:
Fewer lines of code are needed [1]
The program is simpler, so it is easier to design, code, maintain, modify, test or debug [1]
Other points that also score: the days can be accessed directly using the month number as the index.
Get the day, month and year. Add the shelf life to the day. If the day is past the end of the month, move to the next month and take away the days in the month. If the month goes past 12, move to January of the next year.
FUNCTION GetDate(ProductionDate : DATE, ShelfLife : INTEGER) RETURNS DATE
DECLARE NewDate : DATE
DECLARE DD, MM, YY, LastDay : INTEGER
DD ← DAY(ProductionDate)
MM ← MONTH(ProductionDate)
YY ← YEAR(ProductionDate)
DD ← DD + ShelfLife
LastDay ← DaysInMonth[MM]
IF DD > LastDay THEN
MM ← MM + 1
DD ← DD - LastDay
IF MM = 13 THEN
MM ← 1
YY ← YY + 1
ENDIF
ENDIF
NewDate ← SETDATE(DD, MM, YY)
RETURN NewDate
ENDFUNCTIONThree INTEGER variables declared for DD, MM and YY [1]
Date functions DAY, MONTH and YEAR used to get the three values [1]
ShelfLife added to DD [1]
LastDay taken from DaysInMonth using MM as the index [1]
Tests DD > LastDay, then adds 1 to MM and sets DD to DD minus the days in the month [1]
If MM is 13, sets MM to 1 and adds 1 to YY [1]
Uses SETDATE to make a DATE (declared as type DATE) and returns it [1]
▶ Whole paper
Video solution of the whole paper · by Pseudocode Pro. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.