9706/41/O/N/25 question 2: worked solution (October/November 2025, paper 41)

Show as plain text

Cambridge A2 Level Accounting 9706 · 4.1 Activity based costing (ABC) Worked solution from the Cost and management accounting (A Level) Theory (Paper 4) booklet, Part 1 of 4. Q17 9706/41/O/N/25 original Q2 Structured · 25 marks Worked solution (a) State the steps (any four): Split the overheads into cost pools. [1] Identify the cost driver (the activity) for each pool. [1] Calculate the cost per unit of the cost driver = cost pool ÷ total number of the cost driver. [1] Allocate the cost to each product according to how much of the cost driver the product uses. [1] (b)(i) Existing method: overheads are shared on direct labour hours. Hours: L = 3 × 2 000 = 6 000; M = 2 × 6 000 = 12 000; total 18 000. Overhead L = $240 000 × (6 000 ÷ 18 000) = $80 000; M = $240 000 × (12 000 ÷ 18 000) = $160 000. Details Product L $ Product M $ Direct materials (2 000 × $32; 6 000 × $28) 64 000 168 000 [1] Direct labour (6 000 × $16; 12 000 × $16) 96 000 192 000 [1] Overhead costs 80 000 160 000 [2] Total costs 240 000 520 000 Mark-up 30% 72 000 156 000 [1] Total sales revenue 312 000 676 000 Unit selling price L = $312 000 ÷ 2 000 = $156.00 [1] Unit selling price M = $676 000 ÷ 6 000 = $112.67 [1] (b)(ii) ABC: cost per cost driver = cost pool ÷ total driver. Machine set-ups: $60 000 ÷ (100 + 60) = $375 per set-up. Inspections: $108 000 ÷ (150 + 100) = $432 per hour. Order processing: $72 000 ÷ (30 + 34) = $1 125 per order. Details Product L $ Product M $ Machine set-ups 37 500 22 500 [1] Inspections 64 800 43 200 [1] Order processing 33 750 38 250 [1] Total overhead costs 136 050 103 950 Details Product L $ Product M $ Direct materials 64 000 168 000 Direct labour 96 000 192 000 [1] Overhead costs 136 050 103 950 Total costs 296 050 463 950 [1] Mark-up 30% 88 815 139 185 [1] Total sales revenue 384 865 603 135 Unit selling price L = $384 865 ÷ 2 000 = $192.43; M = $603 135 ÷ 6 000 = $100.52 So the unit selling prices are L $192.43 and M $100.52 . [1] (c) Advise means: points for and against, then a decision with a supporting comment. Any six comments: ABC allocates overhead costs to the products more accurately . [1] The cost of each product is more realistic because it is based on the activity each product uses . [1] With ABC, Product L has a higher cost per unit ($148.03 against $120) while Product M has a lower one ($77.33 against $86.67). [1] The setting of selling prices is more realistic. With the same mark-up, the price of L would rise from $156 to $192.43 and the price of M would fall from $112.67 to $100.52. [1] But ABC is time consuming and costly , [1] as expertise is needed. [1] (Another point that also scores: an extensive training programme is required.) Decision: write that the directors should use ABC (because it gives more accurate costs and prices) with a comment that supports it. [1] KEY IDEA ABC shares overheads by the activities that cause them, so products that use more of those activities carry more of the cost. TOTAL 25 marks Official mark scheme VIDEO ▶ Topic lesson A lesson on this topic · by Edex World. Tap the picture to open it on YouTube.