Cambridge AS Level Computer Science 9618 · 12.1 Program Development Life cycle

Q5 · 9618/21/M/J/23 Q5

Worked solution from the Software Development Paper 2 Problem-solving and Programming booklet, Part 1 of 3.

Q59618/21/M/J/23original Q5Structured · 6 marks
Question 5 from 9618/21/M/J/23

Worked solution

(a)(i)

Write any two reasons:

There is no working software until late in the life cycle, so it is slower to reach the market than competitors [1]

It is slow and difficult to cope with changes in the requirements [1]

It needs a lot of involvement and feedback from the client (this also scores).

(a)(ii)

Iterative development or Rapid Application Development (RAD). [1]

(b)

Stage: beta testing [1]

Description (any two of these):

A small group of potential users test the website [1]

They check that it works as required in the real world and report errors [1]

They give feedback and suggestions, which are dealt with before the website is released to everyone.

KEY IDEAWhen requirements keep changing and speed matters, use an iterative model that gives early versions, not waterfall.
TOTAL 6 marks

Official mark scheme

Mark scheme for 9618/21/M/J/23 question 5
VIDEO
▶ Starts at Q5 (33:02)

Starts at Q5 (33:02) · by Pseudocode Pro. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.